The principal features of the Second Yong San Gang Irrigation Project are: (a) construction of an estuary dam across the mouth of the Yong San Gang, consisting of an embankment, a concrete sluice and a navigation lock; (b) construction of a sea dike; (c) construction of 16 pumping stations to serve the land to be reclaimed and developed; (d) construction of main and secondary canals; (e) reclamation of tidal land through land leveling and construction...
Voir la suite
INFORMATION
-
1977/01/31
-
Mémorandum et recommandation du Président
-
P1977
-
1
-
1
-
2010/06/24
-
Disclosed
-
Korea - Second Yong San Gang Irrigation Project
-
balance of payment