The Indonesia Power Distribution Development Program for Results (PDDP or “the Program”) aims i) to increase access to electricity supply, ii) to improve quality of service and distribution efficiency (through reduction of distribution losses) and reliability (through reduced outages and improved voltage conditions) of its delivery in selected geographic areas of Indonesia, iii) To improve power consumption and iv) to improve PLN’s institutional capacity...
Voir la suite
INFORMATION
-
2016/01/15
-
Évaluation environnementale
-
104284
-
1
-
1
-
2016/03/29
-
Disclosed
-
Environmental and social systems assessment
-
Institutional Strengthening and Capacity Building