The Haripur Power Project for Bangladesh aims to increase power availability through low-cost private generation. The project consists of financing and building the Haripur Power Plant, a gas-fired combined cycle electric power plant to be developed, owned, and operated by a wholly owned subsidiary of the AES corporation. The combined cycle gas turbine plant will include a gas-fired combustion turbine and its generator, a heat recovery boiler using...