Three decades of conflict have left Afghanistan’s power system battered. More than half of the population has no access to electricity and those connected to the grid suffer from frequent, lengthy power blackouts. Expensive generation is prevalent, and the country has entrenched poverty and stifled economic growth. The Ghazanfar Group, a leading private conglomerate, will build and operate a 50-megawatt gas fired power plant, known as the Mazar Independent...