Information
-
Date du document
2013/10/03
-
Type de document
Document d’information sur le projet
-
Numéro du rapport
PIDC1218
-
Volume
1
-
Total Volume(s)
1
-
Pays
Yémen, République du
-
Région
-
Date de publication
2013/12/04
-
Disclosure Status
Disclosed
-
Titre du rapport
Yemen - North-South Corridor Highway Project
-
Mots clé
access roads,axle load,Bridges,collaboration,Competitive Bidding,Construction,contractors,data services,decision making,Development status,engineers,exchange rates,flexibility,framework,highway projects,Highways,institution building,institutional development,learning,main roads,Operations,Pavement,Pavement Management,Pavement Management System,periodic maintenance,PMS,priorities,Project Completion,Project Implementation,public sectors,quality at entry,Rate of Return,resources development,Road Construction,Road Maintenance,Road Rehabilitation,road system,Roads,supervision,sustainability,technical assistance,traffic,traffic counting,training centers,Transport,transport projects,Urban Planning,Vehicle Operating Costs; Asphalt; Construction; Consultants; Drainage; Feeder roads; Fellowships; Flood control; Human resources development; Improvement; Institution building; Maintenance & repair; Maintenance equipment; Road & highway networks; Road & highway planning; Road surfaces; Roads & highways; Secondary roads & highways; Technical assistance; Training centers; Training needs; Training programs; Transport planning; Transport policy; Transport systems; Vocational training
- Voir la suite
Télécharger
RAPPORT COMPLET
Version officielle du document (peut inclure des signatures etc…)
- Version officielle (PDF)
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.