Information
-
Auteur
Bojun Huang
-
Date du document
2021/03/28
-
Type de document
Plan de passation des marchés
-
Numéro du rapport
STEP47043
-
Volume
1
-
Total Volume(s)
1
-
Pays
-
Région
-
Date de publication
2021/03/28
-
Disclosure Status
Disclosed
-
Titre du rapport
China - EAST ASIA AND PACIFIC- P153115- Hunan Integrated Management of Agricultural Land Pollution Project - Procurement Plan
-
Mots clé
irrigation system; agriculture input; contaminated land; community participation in procurement; heavy metal; disease control equipment; disease control techniques; agricultural land; sand and gravel; Revised Plan Date; heavy metal pollution; integrated pest control; risk management options; dam safety assessment; agricultural land management; Crop; water; agricultural product; irrigation ditches; market approach; contract completion; irrigation canal; irrigation water; drainage ditch; Environmental Assessment; advance procurement; project quality; retroactive financing; project request; selection method; technical component; digital camera; environmental component; agronomic implementation; pumping station; protection equipment; technical proposal; field road; crop protection; single source; local policy; standards development; selection component; sustainable financing; soil type; project plan; laboratory instrument; projection screens; consultancy assignment; informed choice; high sea; inspection for vehicle; natural village; social evaluation; farmer training; test equipment; long-term monitoring; credit contract; straw baler
- Voir la suite
Télécharger
RAPPORT COMPLET
Version officielle du document (peut inclure des signatures etc…)
- Version officielle (PDF)
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.