Information
-
Auteur
-
Date du document
2013/04/28
-
Type de document
Rapport sur l’état d’avancement et les résultats des projets
-
Numéro du rapport
ISR10070
-
Volume
1
-
Total Volume(s)
1
-
Pays
-
Région
-
Titre du rapport
Africa - WAPP APL 1 (1st Phase - COASTAL TRANSMISSION BACKBONE) : P075994 - Implementation Status Results Report : Sequence 14
-
Mots clé
coastal state;power utility;power utilities;power exchange;Loan to Turkey;adaptable program loan;power supply;cross-border electricity trade;kv transmission line;power transfer;peak power;vulnerability to drought;quantity of electricity;cash compensation;loan proceeds;financial agreement;response time;equipment installation;transmission network;power system;credit closing;load shedding;result indicator;interconnection link;power outage;power loss;results framework;intermediate indicator;
Voir la suite
Télécharger
RAPPORT COMPLET
Version officielle du document (peut inclure des signatures etc…)
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.