Skip to Main Navigation

Nigeria - Ibadan Urban Flood Management Project : Resettlement Plan (Vol. 4 of 6) : Resettlement Action Plan for Channelisation and Construction of Flood Control Infrastructure on First Pool of Sites, Kudeti-Olojoro Channel on the Drainage Master Plan (anglais)

The development objective of the Ibadan Urban Flood Management Project for Nigeria is to improve the capacity of Oyo state to manage flood risk in the city of Ibadan. Some of the negative impacts and mitigation measures include: (1) compensation at replacement cost based upon market value of land of equal size and use with similar or improved public infrastructure facilities and services and located in the same vicinity plus the cost of any registration...
Voir la suite

INFORMATION

  • 2020/03/01

  • Plan de réinstallation

  • SFG3489

  • 4

  • 6 (Voir tous les volumes)

  • Nigéria,

  • Western and Central Africa,

  • 2021/10/28

  • Disclosed

  • Resettlement Action Plan for Channelisation and Construction of Flood Control Infrastructure on First Pool of Sites, Kudeti-Olojoro Channel on the Drainage Master Plan

  • land use act

TÉLÉCHARGER

RAPPORT COMPLET

Version officielle du document (peut inclure des signatures etc…)

This document is being processed or is not available.