The current project involves a two-phase development of the Aynak copper mine including a processing plant with a capacity of 30 ktpd of ore in phase one and 60 ktpd in phase two. The proposed alternative involves: 1) building a processing plant with a capacity of only 10 ktpd of ore, or a third of size envisaged in phase one, 2) relying on a mining contractor, and 3) renting diesel generators to supply power. This alternative project would reduce...
Voir la suite
INFORMATION
-
2013/04/01
-
Fiche
-
79738
-
1
-
1
-
2013/07/31
-
Disclosed
-
Executive summary for the Aynak copper mine
-