The development objectives of Power Sector Reform and Sustainable Hydropower Development Project are to: (a) strengthen the capacity of the power sector agencies to plan and prepare hydropower and transmission line projects following international standards and best practices; and (b) improve the readiness of the power sector agencies for regulatory and institutional reforms. This restructuring requires the extension of the closing date of the grant...
Voir la suite
INFORMATION
-
2018/06/28
-
Document de projet
-
RES33244
-
1
-
1
-
2018/06/28
-
Disclosed
-
Disclosable Restructuring Paper - Nepal: Power Sector Reform and Sustainable Hydropower Development (PSRSHD) - P150066
-
sustainable hydropower