The Greater Mekong Sub-region Power Trade Project consists of mainly two construction works. One is the construction of a transmission line of 82km from Ban Hat substation to Stung Treng substation. Responsibility of the Laotian side is the 25.7km distance between Ban Hat Substation and the Lao-Cambodian border. The other construction work is the expansion of the existing Ban Hat Substation to connect the above-mentioned transmission lines. Based...
Voir la suite
INFORMATION
-
2011/02/01
-
Plan de réinstallation
-
RP534
-
3
-
2011/04/01
-
Disclosed
-
Ban Hat in Champasak Province (Laos) to Stung Treng (Cambodia)
-
transmission line