Information
-
Auteur
-
Date du document
2014/07/22
-
Type de document
Document d’information sur le projet
-
Numéro du rapport
PIDC1098
-
Volume
1
-
Total Volume(s)
1
-
Pays
-
Région
-
Titre du rapport
Project Information Document (Concept Stage) - BD: Power Generation Efficiency Improvement Project - P128012
-
Mots clé
Energy Efficiency in Heat and Power;Power Generation;heat recovery steam generator;Thermal Power Generation;dual fuel power plant;electricity generation company;generation capacity;base load power;gas;expansion of transmission;high voltage line;natural gas supply;natural gas production;efficient power plant;large power station;private power;mitigating climate change;reduction in carbon;steam power plants;transmission and distribution;reduction in emission;availability of gas;rural electric cooperative;reduction in budget;large power plant;line of accountability;power distribution company;gas transmission network;power sector reform;primarily due;gas transmission system;natural gas reserves;peak electricity demand;Access to Electricity;per capita consumption;gdp growth rate;Gas Turbine;rental contract;liquid fuel;budgetary transfer;corporate entity;steam cycle;exploration work;generation mix;gas line;road map;installed capacity;affordable supply;cycle plant;Proposed Investment;power supply;power transmission;auxiliary equipment;energy infrastructure;account receivable;production of gas;oecd countries;plant performance;institutional strengthening;power shortage;generation expansion;domestic coal;diameter pipeline;infrastructure constraints;transmission line;gas utilization;institutional context;financing source;coal reserve;national grid;coal fire;financial closure;construction cost;energy specialist;monitoring process;human capacity;corporate board;enhancing transparency;tariff adjustment;generation plant;co2 emission;high tariff;annual target;management structure;employee evaluation;institutional governance;retail tariff;gas availability;sustainable level;Energy Sector;rural area;procurement process;feed water;electricity distribution;institutional performance;generation cost;capacity payment;efficiency gain;original contract;distribution asset;
Voir la suite
Télécharger
RAPPORT COMPLET
Version officielle du document (peut inclure des signatures etc…)
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.