The Power Distribution Project consists of a three-year portion of the Project Companies' five-year expansion programs comprising the rehabilitation and expansion of their transmission and distribution systems. About 20 to 25 percent of the total expenditures would be for rehabilitation. Facilities to be installed include high-voltage connecting lines and related substations, low-voltage distribution feeders and transformers and related distribution hardware such as switchgear, meters, etc.
Information
-
Date du document
1966/12/31
-
Type de document
Rapport d’évaluation des services de la Banque mondiale
-
Numéro du rapport
TO537
-
Volume
1
-
Total Volume(s)
1
-
Pays
-
Région
-
Date de publication
2010/06/18
-
Disclosure Status
Disclosed
-
Titre du rapport
Brazil - Companhia Paranaense de Energia Electrica - Transmission and Distribution Project
-
Mots clé
Electric networks; Facilities; Meters; Power distribution; Substations; Switching equipment; Transformers; Transmission lines
- Voir la suite
Télécharger
RAPPORT COMPLET
Version officielle du document (peut inclure des signatures etc…)
- Version officielle (PDF)
- TXT*
- Total Downloads** :
- Download Stats
-
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.