Ratings show a highly satisfactory project outcome, highly likely sustainability, and substantial institutional development impacts, achieved through a highly satisfactory Bank performance, and a satisfactory...
The Sao Paulo Integrated Urban Transport Project (Barra Funda-Roosevelt Link) aims i) to finance infrastructure and equipment which are critical to the physical integration between the two existing rail...