The objective of the North-Eastern Corridor Road Asset Management Project for Uganda is to reduce transport cost by improving and preserving the road asset on a selected corridor through the introduction...
The Disability Inclusion and Accountability Framework, updated in 2022, lays out a road map for (i) including disability in the World Bank’s policies, operations, and analytical work; and (ii) building...
This report provides insights into the current situation and overall burden of trauma and RTCs in Malawi, shares what we have learned about how to effectively run a digital trauma registry in a low-resource...
Ratings for the Tocantins Integrated Sustainable Regional Development Project for Brazil were as follows: outcome and Bank performance was moderately satisfactory, and monitoring and evaluation (M and...
Ratings for the Second Urumqi Urban Transport Project for China were as follows: outcome and Bank performance was satisfactory, and monitoring and evaluation (M and E) quality was substantial. Some lessons...
NULL
The business pulse survey (BPS) in Madagascar, conducted by the Madagascar National Statistical Agency (INSTAT) with technical and financial support from the World Bank, provides information to monitor...
Ratings for the Local Governance and Services Improvement Program for West Bank and Gaza were as follows: outcome was satisfactory, Bank performance was moderately satisfactory, and monitoring and evaluation...
Ratings for the Second Kerala State Transport Project (KSTP-II) for India were as follows: outcome and Bank performance was moderately satisfactory, and monitoring and evaluation (M and E) quality was...
Outdoor air pollution accounts for an estimated 4.2 million deaths worldwide, the majority of which are caused by exposure to fine particulate matter (or PM2.5) air pollution. Most of these deaths occur...
Ratings for the Goma Airport Safety Improvement Project for Congo, Democratic Republic of were as follows: outcome and Bank performance was satisfactory and monitoring and evaluation (M and E) quality...
The development objective of First Phase of the Accelerating Transport and Trade Connectivity in Eastern South Asia Project for Bangladesh is to increase the efficiency and resilience of trade and transport...
The development objective of First Phase of the Accelerating Transport and Trade Connectivity in Eastern South Asia Project is to increase the efficiency and resilience of trade and transport along selected...
The development objective of North-East Economic Development Project for Morocco is to improve connectivity and enable private sector growth in the project area. This project has three components. 1) The...
Image acquisition and surveying using unmanned aerial vehicles (UAVs) is a very promising technology for Small Island Developing States (SIDS). UAVs can be a relatively low-cost data collection tool at...