Skip to Main Navigation

Documents et rapports

Affiche 1 - 20 sur 48 résultats | Afficher les résultats par groupe de 10 | 20 | 50

Télécharger:
Aucun résultat. Vous pouvez modifier vos critères et lancer une autre recherche. Je ne trouve pas le document recherché.

  • Bangladesh - Gas Sector Efficiency Improvement and Carbon Abatement Project (anglais)

    The development objective of the Gas Sector Efficiency Improvement and Carbon Abatement Project for Bangladesh is to improve efficiency of gas distribution and end-use, and support carbon abatement in...

    Type de document: Document d’évaluation du projet Numéro du rapport: PAD5268 Date du document: 28 juin 2023 Mode de publication: Disclosed Auteur: World Bank

  • Uzbekistan - Syrdarya Efficient Power Generation Project (anglais)

    The development objective of the Syrdarya Efficient Power Generation Project for Uzbekistan is to increase flexible and efficient electricity generation in line with a least-cost pathway to decarbonize...

    Type de document: Document d’évaluation du projet Numéro du rapport: 181195 Date du document: 17 avril 2023 Mode de publication: Disclosed Auteur: World Bank

  • Côte d’Ivoire - Energies Guarantee Project (anglais)

    Ratings for the Energies Guarantee Project for Côte d’Ivoire were as follows: outcome and Bank performance was moderately satisfactory, and monitoring and evaluation (M and E) quality was modest. Some...

    Type de document: Bilan de fin d’exécution et de résultats Numéro du rapport: 180787 Date du document: 12 avril 2023 Mode de publication: Disclosed Auteur: World Bank

  • Egypt - Household Natural Gas Connection Project (anglais)

    Ratings for the Household Natural Gas Connection Project for Egypt were as follows: outcome and Bank performance was satisfactory, and monitoring and evaluation (M and E) quality was substantial. Some...

    Type de document: Bilan de fin d’exécution et de résultats Numéro du rapport: ICR5907 Date du document: 27 mars 2023 Mode de publication: Disclosed Auteur: World Bank

  • Cameroon - Kribi Gas Power Project (anglais)

    The overall outcome of the Kribi Gas Power Project for Cameroon was satisfactory, with moderately satisfactory Bank performance and high monitoring and evaluation quality. There are several lessons and...

    Type de document: Bilan de fin d’exécution et de résultats Numéro du rapport: 136765 Date du document: 23 octobre 2019 Mode de publication: Disclosed Auteur: