This report provides insights into the current situation and overall burden of trauma and RTCs in Malawi, shares what we have learned about how to effectively run a digital trauma registry in a low-resource...
Ratings for the Second Urumqi Urban Transport Project for China were as follows: outcome and Bank performance was satisfactory, and monitoring and evaluation (M and E) quality was substantial. Some lessons...
Ratings for the Goma Airport Safety Improvement Project for Congo, Democratic Republic of were as follows: outcome and Bank performance was satisfactory and monitoring and evaluation (M and E) quality...
The development objective of First Phase of the Accelerating Transport and Trade Connectivity in Eastern South Asia Project for Bangladesh is to increase the efficiency and resilience of trade and transport...
Image acquisition and surveying using unmanned aerial vehicles (UAVs) is a very promising technology for Small Island Developing States (SIDS). UAVs can be a relatively low-cost data collection tool at...
Ratings for the Heilongjiang Public Transport Project for China were as follows: outcome was satisfactory, Bank performance was moderately satisfactory, and monitoring and evaluation quality (M and E)...
Using geo-coded, firm-level data on more than 51,000 establishments in 649 metropolitan areas in 98 developing economies, from the World Bank’s Enterprise Surveys and a new global database on city-level...
The key messages of this newsletter include: (i) In 2021, global trade in goods and services returned to pre-pandemic levels, despite multiple headwinds.Global trade’s resilience may soon be tested again...
A small open economy, Benin has seen growth that is above average for the region. The volatility of high growth spells combined with low productivity growth has translated into limited gains in income...
The main objective of the consultancy service is to establish the technical, environmental, social, economic and financial viability of the project and prepare detailed project reports for rehabilitation...
Ratings of Second Road and Safety Improvement Project for Ukraine were as follows: outcome was moderately satisfactory, Bank performance was moderately satisfactory, and monitoring and evaluation quality...
Ratings for the Jiaozuo Green Transport Safety Improve Project for China were as follows: overall outcomes were highly satisfactory, bank performance was satisfactory, and monitoring and evaluation quality...
Ratings of Third Highway Project for Azerbaijan were as follows: outcome was moderately satisfactory, Bank performance was satisfactory, and monitoring and evaluation quality was substantial. Some of the...
The study ‘Vulnerability to Human Trafficking in Nepal from Enhanced Regional Connectivity’ was undertaken to enhance our understanding of the current and changing dynamics of trafficking in persons in...