Mozambique - Malawi Regional Interconnector Project : Resettlement Plan (Vol. 2) : Resettlement Policy Framework for Mozambique Section from the Matambo Substation to the Border with Malawi (142 km) (Anglais)

Résumé

The development objective of the Malawi Regional Interconnector Project for Mozambique is to interconnect Malawi and Mozambique’s transmission systems to engage in bilateral and regional power trade in the Southern Africa power pool. Some of the negative...  Voir la suite

Information

  • Mozambique;
  • 2019/07/01 15:14:05
  • Plan de réinstallation;
  • SFG5575
  • 2
  • 6 (Voir tous les volumes)
  • Afrique
  • Afrique
  • 2019/07/26 12:50:27
  • Disclosed
  • Resettlement Policy Framework for Mozambique Section from the Matambo Substation to the Border with Malawi (142 km)
Voir la suite

Télécharger

Rapport complet en Anglais

Version officielle du document (peut inclure des signatures etc…)

*La version texte est une version à reconnaissance optique de caractères non-corrigée. Cette version est fournie uniquement pour accommoder les utilisateurs disposant de connections lentes.