Pakistan - Fifth Water and Power Development Authority (WAPDA) Power Project (anglais)

The Fifth WAPDA Power Project will assist the Water and Power Development Authority (WAPDA) in the expansion of the extra high voltage power transmission network, thereby permitting the optimal operation of interconnected generation facilities and contributing to reduced transmission losses. The project consists of: (a) the installation of 1,100 km of 500-kV transmission line, (b) the installation of two new 500-kV substations and the extension and...