This is an environmental assessment of the Second Jiangxi Highway Project for China, which improves four rural roads. These are some of the negative environmental impacts and their proposed mitigations. Land subject to plant removal will have vegetation restored, including a greenbelt set up along roadsides. Drainage works will include ditches to prevent soil erosion, run-off, floods, and interference with irrigation. Earth borrowing and waste disposal...
Voir la suite
INFORMATION
-
2001/01/31
-
Évaluation environnementale
-
E425
-
14
-
2010/07/01
-
Disclosed
-
Taihe-Ganzhou Expressway Mainline, the Inter-connecting roads, and the rural roads improvement program (RRIP) : environmental assessment summary (fourth edition)
-
connecting road