Skip to Main Navigation

Documents et rapports

Affiche 1 - 7 sur 7 résultats | Afficher les résultats par groupe de 10 | 20 | 50

Télécharger:
Aucun résultat. Vous pouvez modifier vos critères et lancer une autre recherche. Je ne trouve pas le document recherché.
  • Pilot climate change adaptation market study : Turkey (anglais)

    This market study took place between January 2012 and June 2013 with the aim of understanding the needs of the Turkish private sector in order to improve climate resilience. It was funded jointly by the...

    Type de document: Document de travail Numéro du rapport: 113599 Date du document: 1 janvier 2013 Mode de publication: Disclosed Auteur: Baglee, Alastair,Connell, Richenda,Haworth, Anna,Rabb, Ben,Acclimatise, Will Bugler,Ulug, Gökhan,Capalov,Lale,Hansen, Dinne Smederup,Glenting, Carsten,Jensen, Christian Huss,Laugesen, Frederik Moller

  • Climate risk case study : Bulleh Shah paper mills - Packages, Ltd. Kasur, Pakistan (anglais)

    This study assesses climate-related risks for Bulleh Shah Paper Mills (BSPM) in Kasur, Pakistan. This facility is owned by Packages Limited, the leading integrated paper products manufacturer in Pakistan...

    Type de document: Document de travail Numéro du rapport: 62640 Date du document: 1 avril 2011 Mode de publication: Disclosed Auteur: Colley, Michelle,Connell, Richenda,Firth, John,Stenek,Vladimir


  • Climate risk and business : agribusiness - Ghana oil palm development company - full report (anglais)

    This study assesses climate-related risks for Ghana Oil Palm Development Company (GOPDC). GOPDC is an integrated agro-industrial company with about 21,000 hectares of oil palm plantations -13,000 of which...

    Type de document: Document de travail Numéro du rapport: 63690 Date du document: 1 janvier 2011 Mode de publication: Disclosed Auteur: Colley, Michelle,Connell, Richenda,Firth, John,Stenek,Vladimir

  • Climate risk and financial institutions : challenges and opportunities (anglais)

    This report analyzes in some detail the risks to project finance and the performance of real-sector investments. Options, futures, derivatives, foreign exchange and more exotic instruments are not specifically...

    Type de document: Document de travail Numéro du rapport: 62653 Date du document: 1 janvier 2011 Mode de publication: Disclosed Auteur: Amado, Jean Christophe,Connell, Richenda,Stenek,Vladimir

  • Climate risk case study : first Khimti hydropower scheme Himal Power Limited, Nepal (anglais)

    This report presents the outcomes of a study analyzing the potential risks from climate change for the first Khimti run of the river hydro-electric power scheme in Nepal. First Khimti is owned and operated...

    Type de document: Document de travail Numéro du rapport: 62639 Date du document: 1 janvier 2011 Mode de publication: Disclosed Auteur: Colley, Michelle,Connell, Richenda,Firth, John,Stenek,Vladimir

  • Climate risk and business : practical methods for assessing risk (anglais)

    The main objective of the first set of pilot climate risk assessment studies undertaken by International Finance Corporation (IFC) was to test and begin to develop methods for evaluating climate risks...

    Type de document: Document de travail Numéro du rapport: 62652 Date du document: 1 janvier 2010 Mode de publication: Disclosed Auteur: Connell, Richenda,Hidalgo,Anna,Kamins,Rachel Rose,Stenek,Vladimir