The Prestea-Obuasi Transmission Line project erected a 114.6114.6 km long, 161 kV line that parallels an existing line, but has its own right-of-way (ROW). POTL involved erecting pylons approximately every...
The Prestea-Obuasi Transmission Line project erected a 114.6114.6 km long, 161 kV line that parallels an existing line, but has its own right-of-way (ROW). POTL involved erecting pylons approximately every...