Project data can be downloaded in groups of 500. Move the blue
circle to select a group of 500 projects for download. When
your download is finished, click the Excel icon again to
select the next group of 500 projects.
Range
×
000000
You are downloading 1 to 500 records.
Affiche 1 - 1 sur 1 résultats | Afficher les résultats par groupe de
10
|
20
|
50
Much of Liberia’s infrastructure to generate, transmit, and distribute electric power was destroyed during 15 years of civil conflict. At the time the project was being prepared in 2009, most of the population...
Type de document: FicheNuméro du rapport: 129217Date du document: 1 juin 2018Mode de publication: DisclosedAuteur: