The project consists of the following: (a) the construction of a new deep-water quay, approximately 200 meters long and 8.5 meters deep; (b) the construction of a shallow-draft quay and of sloping concrete...
The project consists of the following: (a) the construction of a new deep-water quay, approximately 200 meters long and 8.5 meters deep; (b) the construction of a shallow-draft quay and of sloping concrete...
Immediate needs for increased capacity at Douala, the main port of Cameroon, will be met with the help of a 1.5 million dollars credit from the International Development Association (IDA).