  • Pakistan - Tenth and Eleventh Railway Projects (anglais)

    The Tenth and Eleventh Railway Projects in Pakistan was implemented. Implementation was very slow to take off. The Bank's supervision was flawed. It neglected to follow through on the planned "joint International...

    Type de document: Rapport d'évaluation rétrospective Numéro du rapport: 10015 Date du document: 18 octobre 1991 Mode de publication: Disclosed Auteur:

  • Pakistan - Eleventh Railway Project (anglais)

    The outcome of the Eleventh Railway Project for Pakistan was unsatisfactory. The project did not achieve its main objectives and was not completed, its impact was very modest, sustainability is not likely...

    Type de document: Rapport d’achèvement du projet Numéro du rapport: 7781 Date du document: 16 mai 1989 Mode de publication: Disclosed Auteur:



  • Pakistan - Eleventh Railway Project (anglais)

    The Eleventh Railway Project is designed to improve the utilization of PR's existing assets and consists of the following main components: (a) improvement in locomotive maintenance through the introduction...

    Type de document: Mémorandum et recommandation du Président Numéro du rapport: P3350 Date du document: 30 juin 1982 Mode de publication: Disclosed Auteur:


  • Pakistan - Eleventh Railway Project (anglais)

    The Eleventh Railway Project is designed to improve the utilization of PR's existing assets and consists of the following main components: (a) improvement in locomotive maintenance through the introduction...

    Type de document: Rapport d’évaluation des services de la Banque mondiale Numéro du rapport: 3818 Date du document: 31 mai 1982 Mode de publication: Disclosed Auteur: