Project data can be downloaded in groups of 500. Move the blue
circle to select a group of 500 projects for download. When
your download is finished, click the Excel icon again to
select the next group of 500 projects.
Range
×
000000
You are downloading 1 to 500 records.
Affiche 1 - 1 sur 1 résultats | Afficher les résultats par groupe de
10
|
20
|
50
Tropical Cyclone (TC) Seroja impacted Timor-Leste with heavy torrential rains over a 24-hour period on April 4, 2021, with an average intensity of over 14 millimeters per hour and a peak intensity of over...
Type de document: RapportNuméro du rapport: 167571Date du document: 21 décembre 2021Mode de publication: DisclosedAuteur: World Bank