Skip to Main Navigation

Documents et rapports

Affiche 1 - 20 sur 203 résultats | Afficher les résultats par groupe de 10 | 20 | 50

Télécharger:
Aucun résultat. Vous pouvez modifier vos critères et lancer une autre recherche. Je ne trouve pas le document recherché.
  • Pakistan - Sindh Flood Emergency Rehabilitation Project : Additional Financing (anglais)

    The development objectives of the Sindh Flood Emergency Rehabilitation Project (SFERP) for Pakistan are to: (a) rehabilitate damaged infrastructure and provide short-term livelihood opportunities in selected...

    Type de document: Document de projet Numéro du rapport: PP00011 Date du document: 25 avril 2025 Mode de publication: Disclosed Auteur: World Bank



  • The Potential Cascading Impacts of Climate Change in Cambodia (anglais)

    This paper develops a “plausible worst-case” scenario for Cambodia to illustrate how a severe, 1-in-10-year flood could trigger cascading impacts, including widespread disease outbreaks and financial instability...

    Type de document: Document de travail de recherche sur les politiques Numéro du rapport: WPS10983 Date du document: 25 novembre 2024 Mode de publication: Disclosed Auteur: Pollitt, Hector,Petrauskaite, Migle


  • Annex 3 – Hydrometeorological data report (anglais)

    The WB requested hydrometeorological data and reports to INHGA and National MeteorologicalAdministration (ANM) necessary for the hazard modeling and for development of the FHRM. Ultimately, the WB team...

    Type de document: Rapport Numéro du rapport: 188169 Date du document: 6 mars 2024 Mode de publication: Disclosed Auteur: World Bank

  • Anexa 2 - Raport privind modelarea scenariului de cedare a digurilor (Roumain)

    Scopul principal al acestui raport este descrierea proceselor desfășurate pentru generareahărților de hazard și de risc la inundații pentru scenariile de cedare a digurilor. Raportulprezintă conceptele...

    Type de document: Rapport Numéro du rapport: 188176 Date du document: 6 mars 2024 Mode de publication: Disclosed Auteur: World Bank


  • Annex 1 – RO1000 Danube River Report (anglais)

    This report is an annex to the main modelling report (Output 5 - Report on advice provided to MWF in the preparation of draft FHRMs) in which the methodologies applied for hazard and risk mapping are described...

    Type de document: Rapport Numéro du rapport: 188170 Date du document: 6 mars 2024 Mode de publication: Disclosed Auteur: World Bank


  • Updated Resettlement Action Plan (anglais)

    The development objective of Hezhou Urban Water Infrastructure and Environment Improvement Project for China is to improve flood risk management, reduce water pollution and strengthen water resources planning...

    Type de document: Plan de réinstallation Numéro du rapport: SFG3710 Date du document: 1 février 2024 Mode de publication: Disclosed Auteur: Borrowing Agency