The project consists of the following: (a) the construction of a new deep-water quay, approximately 200 meters long and 8.5 meters deep; (b) the construction of a shallow-draft quay and of sloping concrete aprons; the paving of 20,000 square meters of roads and timber-stacking areas; and the shifting of an existing 20-ton overhead crane to the edge of the new shallow-draft quay; (c) dredging of approximately 100,000 cubic meters in front of the log-handling...