The project includes: a) rehabilitation and upgrading of the Port-au-Prince central market area; b) a sites and services scheme for the relocation of 1,036 families displaced by the upgrading of the market;...
The project will include: a) studies to revalue GECAMINES' fixed assets and assess its net worth, to determine overhead costs and recommend major overhead cost reductions, and to identify areas of GECAMINES'...
The project will provide: a) reconstruction or construction of quays and related facilities and service systems at the deep-water port at Matadi and the river port at Kinshasa; b) cargo-handling equipment...
The project includes: a) rehabilitation of existing ‘modern’ irrigation networks on about 25,000 ha and improvement of water availability on traditional schemes on about 3,000 ha; b) production of improved...
The project includes: a) site screening and evaluation to identify suitable land to settle about 300,000 families over three years; b) a settlement for 2,000 families adjacent to the first Bank-assisted...
The project will finance: a) water supply and sewerage subprojects that meet selection criteria agreed upon by the BNH and IBRD; b) engineering and consulting services as required for design and supervision...
The project will a) improve production of sugarcane on 4,660 ha, tobacco on 2,800 ha, and rapeseed and mustard on over 4,800 ha through improved research and agricultural extension services, development...
The project includes: a) construction, equipping, and furnishing of four primary-teacher training institutes, each with 200 student places; b) boarding facilities for male trainees; c) construction, equipping...
The project consists of: a) construction of hydroplants that will eventually add 1,460 MW to the system; b) completion of the second phase of an oil-fired thermal plant, installation of two combustion...