Ratings convey unsatisfactory project outcomes, unlikely sustainability, though institutional development impacts are modest. And, although the Bank performance is assessed as satisfactory, the Borrower's...
The main objectives of the Transmission Grid Reinforcement Project are to: 1) evacuate power from major generation plants at Sual and Masinloc, both expected to be operational in 1998; 2) reinforce overloaded...
The main objectives of the Transmission Grid Reinforcement Project are to: 1) evacuate power from major generation plants at Sual and Masinloc, both expected to be operational in 1998; 2) reinforce overloaded...